Installation Checklist

  Are Your “Ducks” In A Row??

Pre-Installation checklist
(Stick This On Your ‘Fridge!)
 
PLEASE…complete ALL the items on this checklist the DAY BEFORE our installers arrive. Doing so will help insure a smooth, hassle-free quality installation!! (And keep your installer smiling! )
 
  •         Move large furniture (unless we are scheduled to do it)
  •         Think about good places the installers can move the furniture to!
  •         Remove knick-knacks & breakables from furniture we are moving
  •         Strip bedding
  •         Detach wiring from stereos, home theaters, etc.
  •         Kitchens & utility rooms—disengage washer, dryer, refrigerator, gas appliances. 
  •         Bathrooms—remove toilet unless we are scheduled to do it
  •         Disconnect plumbing from sinks for countertop installation (unless we are scheduled to do it)
  •         Remove old carpet & cushion—unless we are scheduled to do it
  •         Keep work areas ventilated on day of installation (doors and windows open. Not necessary with carpet)
  •         Keep indoor temperature no lower than 65 degrees and no higher than 78 degrees. 
  •         Plastic covering (for jobs requiring sanding)—plastic covering over cabinets & cupboards; seal the room against excessive dust—unless we are scheduled to do it.
  •         Clear carports and patios—our installers use these as “staging” areas to store materials during installation. 
  •         Electricity to the house/building turned on—provide access to electrical outlets
  •         Notify us if you would like leftover pieces left behind for floor mats